Start with the operating requirement.
Define critical loads, phase-one capacity, required operating duration and the target energization date. Establish which resources and controls are included in the project.
EQUIPMENT FOR A COORDINATED POWER SYSTEM
Align utility power, onsite generation, energy storage and controls around the loads your site needs to serve. ISG coordinates the electrical equipment scope with your engineering and integration partners.
BEHIND-THE-FENCE MICROGRID
This illustration shows how equipment may be arranged within a site boundary. It is a visual concept, with the final layout, ratings and operating modes established through project engineering.

Define critical loads, phase-one capacity, required operating duration and the target energization date. Establish which resources and controls are included in the project.
Document the utility interface, protection coordination, islanding requirements, control-system interfaces and commissioning responsibilities with the project engineer and integrator.