ISG PRODUCT INFORMATION
Containerized Solutions
Containerized power equipment packages with transformer and distribution equipment, configured around project requirements.

Containerized equipment package example. Final package configuration is project-specific.
APPLICATION & CONFIGURATION
Where it fits
The containerized equipment package brings transformer and distribution equipment together in a project-specific enclosure, with mechanical and electrical integration.
- Custom enclosure and structural fabrication
- Transformer and distribution equipment integration
- Modular assembly and final finishing
- Project-specific interfaces and equipment layouts
ApplicationsData centers, renewable energy, industrial sites, and distributed power projects
SUPPLIER-PUBLISHED PRODUCT INFORMATION
Package scope
Full source scope reproduced from supplier brochure page 11. Confirm the selected configuration in the approved project submittal.
| IEC/IEEE/UL/CSA/DOE certified transformers | |
|---|---|
| Custom Skid and Container fabrication | |
| Steel Manufacturing Enclosures (IP64-IP65, Fire Rated) | |
| Plug and Play Containerized Systems | |
| In-house CNC, painting, and testing facilities | |
| Complete Mechanical and Electrical Integration |
Standards & certification scope
Supplier scope lists IEC / IEEE / UL / CSA / DOE transformer references and IP64 / IP65 or fire-rated enclosure options. Confirm the selected equipment’s certifications, applicable efficiency requirements, enclosure test reports and complete-package acceptance requirements.
Supplier brochure scope reproduced as published. Component standards and listings do not establish certification of the complete equipment package.
Supplier-published configurations. Confirm the selected ratings, dimensions, applicable standards and listing scope in the project quotation and technical submittal.
PROJECT TIMING & QUALITY
Move from specification to schedule.
Factory-direct coordination keeps equipment scope, pricing and production planning connected. Share your required site-delivery date and energization milestone early so ISG can coordinate the selected configuration, available factory slot and shipment plan.
Quality is specified and documented: confirm applicable standards, inspection, routine testing and warranty coverage in the manufacturer’s quotation and approved technical submittal. Lead time is confirmed for the selected configuration and current factory schedule.
Share your project timelineA STRONGER REQUEST FOR QUOTATION
What should the
factory review?
Send the available requirements. We’ll identify what still needs confirmation.
- What single-line diagram, equipment list and electrical ratings define the required package?
- What skid or container layout, site interfaces, enclosure protection and fire-rating documentation are required?
- Which integration and testing responsibilities, component listings and complete-package approval requirements must the quotation define?